Analyses the team's Sprint velocity over recent Sprints to identify trends, variability, and planning implications — producing a velocity chart summary, average, and guidance for the next Sprint commitment. Use when a Scrum Master or team says things like "review our velocity", "what is our velocity", "how consistent are we", "velocity trend", "are we getting faster or slower", "how many points should we commit to", or "check our historical velocity". Do not use for capacity planning — use sm-capacity-planning for that. Do not use for individual sprint audits.

code-review stable

Contents

Velocity Review

Purpose

Velocity is not a performance metric — it is a forecasting tool. A team with stable velocity can make reliable Sprint commitments and give stakeholders honest delivery timelines. A team with erratic velocity has a signal worth investigating: scope changes, underestimation, team instability, or interruptions. This skill surfaces the pattern so the Scrum Master and team can act on it.


Tool detection

  1. Check for active mcp__azure-devops__* tools → $PM_TOOL = ado
  2. Check for active mcp__jira__* tools → $PM_TOOL = jira
  3. If neither → $PM_TOOL = manual

Step 1 — Collect Sprint history

Ask: "How many Sprints should I look back? The last 5–8 is typically enough to identify a meaningful trend."

Default: last 6 Sprints.

  • ADO: use work_list_team_iterations to list recent iterations, then wit_get_work_items_for_iteration for each, filtering to Done/Closed state. Sum story points.
  • Jira: use sprint reporting tools to retrieve completed story points per sprint.
  • Manual: ask "For each of the last [N] Sprints, provide: Sprint name/number, total story points committed, and total story points completed."

For each Sprint, record:

  • Sprint name and dates
  • Points committed at Sprint start
  • Points completed (Done by Sprint end)
  • Team size (if known — helps normalise for team changes)
  • Any notable context: holidays, team member absence, unplanned work, scope additions mid-Sprint

Step 2 — Calculate the metrics

Average velocity:

Average = sum of completed points across all Sprints ÷ number of Sprints

Predictability rate (commitment accuracy):

Predictability = completed ÷ committed × 100, per Sprint

A rate consistently between 80–100% is healthy. Below 70% suggests chronic overcommitment. Above 110% suggests undercommitment or mid-Sprint scope additions.

Velocity trend:

Compare the rolling average of the first half of the window to the second half.

  • Improving: later Sprints average higher than earlier ones
  • Declining: later Sprints average lower
  • Stable: within ±15% across the window

Variability (standard deviation):

High variability = std dev > 25% of the mean
Low variability = std dev < 15% of the mean

High variability means the team's capacity or scope is inconsistent — worth understanding why.


Step 3 — Identify patterns and causes

For each notable data point (unusually high or low Sprint), note the context if available.

Common causes of velocity dips:

  • Public holidays or team time off (expected — capacity planning accounts for this)
  • Mid-Sprint scope additions (a process issue — discuss in retro)
  • Team member joins or leaves (expected transition cost)
  • Unplanned outages, incidents, or support load
  • Stories carried over from a previous Sprint (inflates previous Sprint, deflates current)

Common causes of velocity spikes:

  • Carryover stories completing early in the new Sprint
  • Unusually simple Sprint content
  • Overtime (not sustainable — flag if recurring)

Step 4 — Present the velocity report

Velocity Review — [TEAM] — [DATE]

Sprints reviewed: [N] ([date range])

┌──────────────────────┬────────────┬───────────┬──────────────┐
│ Sprint               │ Committed  │ Completed │ Predictability│
├──────────────────────┼────────────┼───────────┼──────────────┤
│ [Sprint name]        │ [N] pts    │ [N] pts   │ [N]%         │
│ [Sprint name]        │ [N] pts    │ [N] pts   │ [N]%         │
│ [Sprint name]        │ [N] pts    │ [N] pts   │ [N]%         │
└──────────────────────┴────────────┴───────────┴──────────────┘

Average velocity (completed): [N] points
Velocity range: [min]–[max] points
Standard deviation: [N] points ([X]% of mean) — [Low / Moderate / High] variability
Trend: [Improving / Stable / Declining] — [one sentence explanation]

Average predictability: [N]% — [Healthy / Overcommitting / Undercommitting]

━━━  Recommended next Sprint commitment  ━━━━━━━━━━━━━━

Based on the last [N] Sprints:
  Conservative estimate: [average × 0.85] points
  Typical estimate:      [average] points
  Upper ceiling:         [average × 1.00] points

Adjust downward if next Sprint has known absences or a shorter schedule.
Use sm-capacity-planning for a developer-day based adjustment.

━━━  Notable patterns  ━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━

[Sprint X]: [N] pts — [context note if available]
[Sprint Y]: [N] pts — [context note if available]

⚠ Flags:
  [Any flag worth raising to the team or PO]


Step 5 — Coaching observations

Based on the data, surface one or two observations worth raising in the next Retrospective or with the team:

PatternObservation
Consistent overcommitmentThe team commits more than it delivers every Sprint. Sprint Planning estimates may be optimistic, or mid-Sprint interruptions are not being accounted for.
High variability with no clear causeVelocity swings suggest the team's understanding of story size may be inconsistent. Consider a relative estimation calibration exercise.
Declining trendVelocity has dropped over the review window. Worth investigating whether the team is taking on technical debt, experiencing increased support load, or facing an engagement issue.
Stable and healthyVelocity is consistent and predictable. This is a good foundation for longer-range forecasting and stakeholder delivery estimates.
UndercommitmentThe team consistently delivers more than it commits. This may mean estimates are conservative (not necessarily a problem) or that Sprint scope is being expanded mid-Sprint without being tracked.

Only surface patterns that are genuinely present in the data — don't invent concerns.


Guardrails

  • Never present velocity as a measure of team performance or productivity — it is a planning input, not a KPI.
  • Never compare velocity across different teams — team size, story complexity, and estimation practices vary too much for direct comparison to be meaningful.
  • If the team has fewer than 3 Sprints of data, say so: "With fewer than 3 Sprints of history, it is too early to identify a reliable trend. Track velocity for 2–3 more Sprints before using it for planning."
  • Velocity calculated from partially completed Sprints is unreliable — only include Sprints that have ended.
  • If team size changed during the review window, note it — velocity per person can be a more stable metric during transitions.

Provenance

Authored by abrahamFerga in abrahamFerga/scrum-skills. The content is mirrored here under its upstream license.

Related

audit-backlog-ado Audits the Azure DevOps product backlog for hygiene, story quality, and refinement readiness — identifying items that are too large, missing acceptance criteria, stale, unestimated, or out of priority order. Use when a Scrum Master or Product Owner says things like "audit the backlog", "is the backlog healthy", "review the backlog before refinement", "clean up the backlog", "check backlog hygiene", or "prepare the backlog for planning". Do not use for individual story audits — use audit-user-story for that. Do not use for sprint planning or velocity review. abrahamFerga/scrum-skills MIT audit-sprint-ado Audits a completed or in-progress Azure DevOps sprint against Scrum and ADO best practices — checks Sprint Goal presence, work item hygiene, state transitions, field completeness, capacity tracking, and Definition of Done compliance. Surfaces findings with severity levels and offers to post a summary to the ADO wiki or add comments to specific work items. Use when anyone says things like "audit our sprint in ADO", "review the sprint in Azure DevOps", "check our ADO sprint health", "are our work items following best practices", or "sprint health check". Don't use for Jira, Sprint Planning, Daily Scrum, or Retrospective. Requires an Azure DevOps MCP connection. abrahamFerga/scrum-skills MIT audit-sprint-jira Audits a completed or in-progress Jira sprint against Scrum and Jira best practices — checks Sprint Goal presence, issue hygiene, workflow transitions, field completeness, story point coverage, and sub-task consistency. Surfaces findings with severity levels and offers to add comments to specific issues or export a summary report. Use when anyone says things like "audit our sprint in Jira", "review the Jira sprint", "check our Jira sprint health", "are our issues following best practices", or "sprint health check in Jira". Don't use for Azure DevOps — use audit-sprint-ado instead. Don't use for Sprint Planning, Daily Scrum, or Retrospective. Requires a Jira MCP connection. abrahamFerga/scrum-skills MIT audit-sprint-retrospective-ado Reads an Azure DevOps retrospective — from the ADO Retrospectives extension board, a wiki page, or retro-tagged work items — and produces a structured summary of what the team said, identifies patterns and recurring themes, audits whether action items are properly tracked as work items with owners, and generates concrete suggestions. Use when anyone says things like "summarize our retro", "audit the retrospective in ADO", "what were the action items from the retro", "review the team's retrospective board", "check our retro follow-up", or "did we capture everything from the retro". Don't use for facilitating a retrospective in real time, Jira projects, or general Scrum questions. abrahamFerga/scrum-skills MIT audit-user-story Audits an existing user story against Scrum best practices — checks INVEST criteria, story format, acceptance criteria quality, and Definition of Ready compliance. Raises findings with clear severity levels and offers to post the audit as a comment on the work item for the Product Owner or PM to act on. Use when anyone says things like "audit this story", "review this user story", "is this story ready", "check this PBI", "does this story meet best practices", or pastes a story and asks for feedback. Don't use for creating new stories, sprint planning, or general Scrum questions. Works with ADO, Jira, or a pasted story. abrahamFerga/scrum-skills MIT