sm-impediment-log
Helps a Scrum Master capture, track, and resolve impediments raised during Daily Scrums or Sprint events — logging them as ADO work items, assigning owners, setting target resolution dates, and surfacing overdue or recurring blockers. Use when a Scrum Master says things like "log an impediment", "track this blocker", "what are our open impediments", "any blockers from standup", "review our impediment backlog", "this needs escalating", or "what's blocking the team". Do not use for sprint planning, retrospectives, or general task tracking.
Contents
Impediment Log
Purpose
An impediment is anything outside the team's control that slows or blocks Sprint progress. The Scrum Master's job is to make them visible, get them assigned, and get them resolved — fast. An unlogged impediment is invisible to stakeholders. An impediment with no owner and no target date is a blocker in waiting. This skill makes logging fast and tracking honest.
Tool detection
- Check for active
mcp__azure-devops__*tools →$PM_TOOL = ado - If neither ADO nor Jira →
$PM_TOOL = manual
Mode detection
The user is either:
- Logging a new impediment — phrases like "log this", "we have a blocker", "add an impediment"
- Reviewing open impediments — phrases like "what's open", "show impediments", "any overdue blockers"
- Resolving/updating an impediment — phrases like "that's resolved", "update the blocker", "close this impediment"
Handle each mode below.
Mode A — Log a new impediment
Collect the details
Gather (or ask for) the following:
| Field | Description | Required |
|---|---|---|
| Title | One-line summary — what is blocked | Yes |
| Blocker description | What is the impediment, where it came from, why it exists | Yes |
| Affected story/team member | Which Sprint item or person is blocked | Yes |
| Impact | What happens if this is not resolved — does the Sprint goal slip? | Yes |
| Owner | Who is responsible for resolving it (often the SM, sometimes PO or external) | Yes |
| Target resolution date | When must this be resolved to avoid Sprint impact | Yes |
| Escalation required | Does this need to go above the team (management, external vendor, another team)? | Yes |
Create the work item
ADO: use wit_create_work_item with type Impediment (if the process template supports it) or Issue. Set:
- Title:
[BLOCKER] [title] - Description: blocker description + impact
- Tags:
impediment, plusescalation-neededif escalation is required - Priority: 1 if Sprint goal is at risk, 2 otherwise
- Assigned To: owner
- Target Date (custom field or iteration target)
Link to the affected story using wit_work_items_link if an ID is available.
Manual: output a structured log entry:
Impediment logged — [DATE]
Title: [title]
Affects: [story or person]
Impact: [what slips if unresolved]
Owner: [name]
Resolve by: [date]
Escalate: [Yes / No]
Status: Open
Mode B — Review open impediments
ADO: use wit_query_by_wiql to find all items tagged impediment (or type Impediment/Issue) that are not Resolved/Closed.
Present as a triage table:
Open Impediments — [TEAM] — [DATE]
┌──────┬─────────────────────────────┬──────────┬──────────────┬──────────┐
│ ID │ Title │ Owner │ Resolve by │ Status │
├──────┼─────────────────────────────┼──────────┼──────────────┼──────────┤
│ #123 │ [title] │ [name] │ [date] │ Open │
│ #124 │ [title] │ [name] │ [date] ⚠ DUE │ Open │
└──────┴─────────────────────────────┴──────────┴──────────────┴──────────┘
⚠ Overdue (past target date): [N]
⏳ Due within 2 days: [N]
🔺 Escalation pending: [N]
Flag:
- Any impediment past its target resolution date
- Any impediment that has been open for more than the Sprint length (may have been forgotten or abandoned)
- Any impediment marked for escalation with no escalation action recorded
Mode C — Resolve or update an impediment
Ask: "What is the ID (or title) of the impediment, and what is the resolution?"
ADO: use wit_update_work_item to:
- Set state to Resolved/Closed
- Add a comment via
wit_add_work_item_comment: "Resolved [date]: [resolution summary]. Impediment was open for [N] days."
Manual: output:
Impediment closed — [DATE]
Title: [title]
Resolution: [what was done]
Open for: [N] days
Owner: [name]
Step — Recurring impediment detection
After reviewing open impediments, check for patterns across the current and previous Sprint:
- Has the same type of blocker appeared more than once? (e.g., waiting on design sign-off, external API down, access not provisioned)
- Is the same team or person consistently the source of escalations?
If a pattern exists, surface it: "This is the third Sprint with an impediment waiting on [dependency]. This is worth raising in the next Retrospective as a systemic issue, not just an individual blocker."
Guardrails
- An impediment is outside the team's direct control — a developer who is stuck on a technical problem is not an impediment (it is a development challenge). An external dependency that has not responded in three days is an impediment.
- Never close an impediment without a resolution note — "closed" with no context is not useful in a retro or audit.
- If escalation is required, the SM should act immediately — do not log escalation and wait. Surface it to the right person.
- The impediment log is not a task board. Impediments should be resolved fast and closed — they should not become long-running work items. If an impediment cannot be resolved within a Sprint, it may be a structural issue requiring a different kind of action.